Transmission Infrastructure ESIA — 330kV & 132kV Corridors
A comprehensive, consolidated ESIA was prepared covering two critical high-voltage power transmission corridors. The assignment required the integration of route-specific environmental baseline surveys, tower footprint impact assessments, and detailed socioeconomic profiling of affected urban and peri-urban communities. The scope included multi-stakeholder consultation design, public disclosure schedules aligned with OECD 60-day requirements, grievance mechanism design, RAP scoping and eligibility framework, and a consolidated ESMP.
The consolidated report package was accepted without major revision, enabling the client to proceed to the next project financing milestone. The assignment demonstrated FusedVision's capacity to manage multi-route, multi-standard ESIA engagements with tight disclosure timelines.